The project concerns the supply, installation, and commissioning of equipment to upgrade the water supply infrastructure with the aim of reducing leaks, saving water resources, monitoring and improving the quality of the water supplied, and creating an integrated water resources management system water supply network of the closed zone of the city of Argos.
The system includes a central control station (CSC) that will process the collected results from the Local Control Stations.
The system will include the development and configuration of leak detection and monitoring software and the development and configuration of closed-zone digital twin hydraulic modeling and simulation of the water supply network.
Project Promoter organisation: Municipal Water Supply and Sewerage Company of Argos – Mikines (DEYA ARGOUS – MIKINON GR)
Project Grant: €603,729.00